Use this window and its tabs to view, create, and modify the work scope associated with an overhaul part shop visit. Here you can analyze information about maintenance events (for modifications and life limited parts) and maintenance levels in order to be able to define the work scope for the selected work order.
Once the maintenance levels have been defined, you can release the work scope, creating the interim order structure which will provide the demand for the supply shop orders used to perform the actual disassembly, disposition, repair and assembly.
Information about the agreement with the customer which governs the MRO Shop Visit, the related customer order, the work order details, the event summary and the released interim order structure are available via menu options. You can also generate a report showing a list of optional modifications included in the modification level baseline, which can be done.
For the description of each tab in the window, follow the appropriate link: Define Work Scope, Work Scope Mx Events, Maintenance Level Base Line, Mx Event Sign Off, Superfluous Mx Events, Final Conformance Log, Modification Snapshot, Serial Structure, Actual Off Log, Actual On Log.
(To enable the Final Conformance Log and Modification Snapshot tabs, Fleet and Asset Management must be installed.)
Configure and approve work scope
Reset all
maintenance levels
Approve
maintenance events
Reject approval of
maintenance events
Release work scope
Remove
maintenance event