Create Analysis for Production Schedule Part

Explanation

Use this activity to create one or more analyses connected to a production schedule. You may want to create more than one analysis to fulfill a particular sample frequency.  For example, if you are producing the parts over a five hour period and want to have a sample frequency  of once per hour, you can create five analyses.

The routing operation number determines whether a specific data point will be included in the created analysis. The routing operation number is defined in Manufacturing Standards/Routings

Prerequisites

This activity requires a connection between an analysis type and one or more objects on the production schedule. An active Control Plan Manufacturing must exist for the part to be manufactured. The Control Plan is created in IFS/Quality Management.

System Effects

As a result of this activity, the system transfers the information specified in the dialog box to IFS/Quality Management, where you can process it further by entering the analysis results. 

Window

Production Schedule by Line
Production Schedule by Line Part
Production Line Management
Production Receipt
Report Point Receipt

Related Window Descriptions

Production Schedule by Line
Production Schedule by Line Part
Production Line Management
Production Line Management/Current Production Schedule
Production Receipt
Report Point Receipt
Create Analysis Production Schedule
Production Schedule Analyses
Analysis Result

Procedure

  1. Query or populate the window.
  2. Select the production line for which you want to create one or more analyses.
  3. In the Production Schedule by Line and Production Schedule by Line Part windows, select Create Analysis from the right mouse button menu for the schedule for which you want to create an analysis. In the Production Receipt and Report Point Receipt windows, select Create Analysis from the right mouse button menu in the header of the window.
  4. In the Production Schedule by Line and Production Schedule by Line Part windows, select a Part Revision and Routing Revision using the List of Values. In the Production Receipt and Report Point Receipt windows, these fields are filled in by the system. These fields are required. 
  5. Routing Type, Routing Alternate, and Control Plan Details are filled in by the system.
  6. Select one or more routing operation numbers by selecting the check box adjacent to the Routing Operation No field for which you would like to create an analysis. Only the routing operation numbers connected to your Control Plan    Manufacturing for the specific routings will be displayed. This field is required.
  7. Select the number of analyses you wish to create in the No of Analysis field.
  8. If desired, select the Print Test Instruction check box to print a test instruction.
  9. Click OK. The system now creates one or more analyses of receipts over time for the selected production lines.
  10. You will be asked if you would like to view the created analysis overview. If you click Yes, the Production Schedule Analysis window appears.
  11. For more information on entering results, see Enter Results for Production Schedule Parts.