Use this dialog box to set the production line part routing operation revision, and the alternative to be used to perform line operation analysis. In addition, the routing revision and alternate selected here is used when shop order requisitions are created from the proposed schedule for this production line.
You can enter the values for the parameters such as the lot size, setup time, and run time, to calculate the operation duration. The routing revision and the alternative information and parameters are stored as a snapshot, and used to calculate the consolidated operation durations.
Establish production line run rate