Routing

[About Routings] [About Lot Size Based Alternates] [About Operation Overlap] [About Back Office Configuration Rules] [About Manufacturing Lead Time Calculation] [About Analyze Cost Calculation]

[To Production Schedule Planning] [To MFG Standards][To Define CRO Work Scope] [To Costing]

Usage

Use this window to create and maintain routings for parts. A routing can include only machine information, only labor information, or both. It can have an alternate, be serialized, and also have specific tools associated with it. Note: A routing with an outside operation must exist before you can work with an outside work center. Thus IFS/Purchasing must be installed before you can create routings for outside operations.

For the description of each tab in the window, follow the appropriate link: Routings, Routing Serials, Routing Lot Size, Routing Tools, Unit Cost per Alternate, Process FMEAs, Routing MRB.

The Process FMEAs tab is only visible if you have Failure Modes and Effects Analysis installed. The Routing MRB tab is only available if you have Manufacturing Standards installed.

Activity Diagrams

Create routing
Complete routing
Maintain routing
Manage routings
Calculate lead time
Analyze cost calculation

Activities

Create routing manually
Create routing using template copy
Create routing using template reference
Copy routing revision
Copy routing alternate
Connect work guideline to operation
Enter routing serial ranges
Enter routing lot size minimum quantity
Connect tool ID to operation
Calculate lead time for routing
Set structure/routing alternate plannable
Set structure/routing alternate buildable
Cancel structure/routing alternate
Review routing/structure alternate
Retire structure/routing alternate