Perform Condition Measurements
Explanation
This activity is used to record condition measurements
on a work task. During execution of a scheduled maintenance it is
possible to find abnormalities, such as, measurements that are outside the defined
condition limits. When such measurements are found, you can use the
functionality described in this activity to record the new measurements and
initiate corrective action. When a measure value that is outside any of the
defined condition limits is recorded, a maintenance event is created and added
automatically to the work package (maintenance order) for the ongoing work
scope.
Note: If condition measurement requirements exist on a work task, these measurements must be performed before the
work task can be
completed.
Prerequisites
- The work task must exist in either the
Released or Started status.
- Condition measurement requirements must exist for the work task. The Condition Measurement Required
check box must be selected in the Task Card
tab, e.g., Work Task/Task Card.
- Condition limits must have been defined for the
serial connected to the work task.
System Effects
- Condition measurements are recorded on the work task. This information can be viewed in the Condition Meas.
tab.
- The Condition Measurement Performed check box will be selected in
the Task Card tab, e.g.,
Work Task/Task Card.
- If the measurement is outside the defined limits,
a maintenance event is generated for it. The event will be added automatically
to the maintenance order for the ongoing work scope.
- The condition measurements reported on the work task will be transferred
automatically to Fleet and Asset Management and a history record will be
generated.
Window
Work Task
Prepare Work Order
Report In Work Order
Work Order Execution
Logic
Related Window Descriptions
Work Task
Work Task/Condition Meas.
Prepare Work Order/Work Tasks
Prepare Work Order/Work
Tasks/Condition Meas.
Report In Work Order/Work Tasks
Report In Work Order/Work
Tasks/Condition Meas.
Work Order Execution Logic/Work Tasks
Work Order Execution Logic/Work
Tasks/Condition Meas.
Procedure
- Open the Report In Work Order window
and search for the desired work order.
- Click the Work Tasks tab, select the
desired work task, and then click the Condition
Meas.
tab.
- Right-click and click Perform Condition
Measurement. The Perform Condition Measurement dialog box
opens.
- In the Measured Value field, enter the
measured value of the condition. Note that the previous measurement appears
by default and must be overwritten with the new measure value.
- In the Measured Date field, enter the date
on which the condition measurement was completed. The default value is set
to today's date (i.e., system date) but can be changed.
- Click OK.
- Verify your changes in the Condition Meas. tab.
Note: This activity can be performed from the following tabs as well:
Work Task/Condition Meas., Prepare Work Order/Work
Tasks/Condition Meas., and Work Order Execution Logic/Work Tasks/Condition
Meas..