Use this tab to enter and view information about manual plan lines. The manual plans-tab holds information regarding what operational event that is ongoing at a certain time. New manual plan lines are entered in this tab and it is mandatory to enter a manual plan line number, description, planned start date, as well as a planned finish date of the line for these new lines. When entering a new line, or modifying an existing, it is possible to specify an operational mode on the line as well as specifying if the manual plan line is considered as a maintenance window. If IFS/Maintenance Planning Board is used, a line marked as a maintenance window means that this operational event will not take place, hence there is a window to perform maintenance on the object structure connected to the operational plan.