Quick Reporting of Pending Maintenance Event

Explanation

This activity is used to perform quick reporting of a pending maintenance event. This is useful when you want to finish events that have already been performed. The events will be handled similar to how events distributed as Simplified Work Orders are handled. If the event being finished is an inspection event (initial or continued) for a modification:

If a modification event leading to a part identity change exists and this modification has the Terminating Action execution type, the assigned and/or affected serial will be renamed to include the new part number and revision once the modification is embodied. In order to perform the automatic renaming of a serial once the event is embodied, the new part number and revision for the serial must have been entered on the modification (i.e., in the Change to Part Number and Change to Part Revision fields). Furthermore, when the modification event is embodied, the system will perform a check to validate the following information before renaming the serial:

When the part number is changed on a serial, the template information on the serial is often changed as well and will be updated automatically. If the serial has a structure and the old template information for the structure of the serial does not match the new template structure information, the operational condition of the serial will be set to Non Operational when renamed. When the template information is valid for both the old and new part numbers, the operational condition of the new serial will be the same as the operational condition on the old serial. You can choose to update the operational log history, replacement history as well as other history records with the new part number.

Prerequisites

For serial fault events:

For modification events:

System Effects

Window

Pending Maintenance Events
Flight Log
Serial Maintenance

Related Window Descriptions

Enter General Info (assistant step)
Enter Fault Info (assistant step)
Enter Modification Info (assistant step)
Enter Material List (assistant step)
Enter Operational Parameter Values (assistant step)
Part Identity Change on Serials in Structure (assistant step)
Pending Maintenance Events
Flight Log
Flight Log/Fault
Serial Maintenance 
Serial Maintenance/Modifications

Procedure

  1. Open one of the following windows depending on your work flow:
  1. The Quick Reporting of Pending Maintenance Event assistant or the Quick Report Modification assistant opens.
  2. In the Enter General Info assistant step you need to enter general information on the event.
  3. Verify that the date and time in the Start Date and Finish Date fields are correct. If not, change to the required date(s).
  4. In the Workshop field, enter the ID of the workshop at which the event was performed. Click List to select a valid value.
  5.  In the Man-hours Used field, enter the total number of man-hours spent on the event.
  6. If needed, enter the ID of the employee responsible for carrying out the work.
  7. In the Resource Group field, enter the ID of the resource group required for the event. Click List to select a valid value.
  8. In the Post Maint Check ID field and the Post Maint Check Revision field, enter the identifier and revision of the post maintenance check that is to be carried out after the event has been finished. If a post maintenance check definition has been predefined for the event type, this post maintenance check definition will automatically be defaulted. If applicable, the defaulted value can be changed. Use the List of Values to select suitable values.
  9. In the Work Description field, enter a description of the work to be done for the event.
  10. Click Next.
  11. If the selected event is a serial fault event, the Enter Fault Info assistant step opens. Here you need to enter information on the function breakdown for the repair of the fault.
  12. If the post maintenance check defined for the repaired fault differs from the post maintenance check originally defined for the fault, the new post maintenance check information can be entered in the Post Maint Check ID field and the Post Maint Check Revision field. Use the List of Values to select suitable values.
  13. In the Fault Code field, enter the fault code. Click List to select a valid value.
  14. Once all necessary information is entered, click Next.
  15. If the event being finished is an inspection event (initial or continued) for a modification, the Enter Modification Info assistant step opens. Here you need to enter information on the preventive checks for the modification. It is recommended that you read the information displayed on the assistant step.
  16. You may want to change the inspection to a higher intensiveness or lower intensiveness, embody the modification or terminate inspections of the modification. Enter an appropriate execution type in the New Execution Type field.
  17. If you want to terminate inspections of the modification, select the Terminate Inspections check box.
  18. Click Next.
  19. In the Enter Material List assistant step you can enter the material(s) used for the event.
  20. Click New and enter valid values in the Site, Part Number and Quantity fields.
  21. Once all required values are entered, click Save.
  22. Click Next.
  23.  In the Enter Operational Parameter Values assistant step you can enter the operational parameter values. Right-click and click Suggest Operational Values to retrieve valid values.
  24. Once all required values are entered, click Save.
  25. Click Next or Finish.
  26. The Part Identity Change on Serials in Structure assistant step opens if the serial on the event is to be renamed. In this assistant step you need to enter information on the part revision or affected part in the structure that is to be renamed. You can also define if history records are to be updated with the rename information. It is recommended that you read the information displayed on the assistant step.
  27. Once all necessary information is entered, click Finish to close the assistant and complete your event.