Perform Report Point Receipt with Catch Unit Components
Explanation
This activity is used to handle report point receipt of Catch Unit (CU) enabled
component parts in the production schedules. A catch unit is enabled to allow a specific
inventory part to manage two parallel units of measure. Information regarding
both quantities, inventory and catch, are saved on all the transaction history
records.
Prerequisites
A part can be reserved as a catch quantity only if it
is catch unit enabled for the part.
System Effects
- As a result of this activity, the system will backflush
the CU enabled components and operations used
up to the defined report point.
- The
report point balance will be updated for the specific report point.
- If
routing is defined, all the operation steps falling between this report point and the previous
one are backflushed at standard cost.
- Operation-linked catch
unit enabled components used by the reported operations
will be backflushed.
- Material not linked to
operations is assumed to be required at the start of the production. Thus, it is backflushed at the first report point.
- If inbound locations are defined, they
will be used in the backflush search hierarchy.
- If an alternate component
substitution sequence is defined, it will be used in backflush when issuing material.
Inventory transactions will be created for all issued catch
unit enabled components.
- History transactions are written for any backflushed machine or labor
operations.
Window
Report Point
Receipt
Production
Receipt
Production
Schedule By Line
Production Schedule By Line Part
Production Line
Management
Related Window Descriptions
Report Point
Receipt
Production
Receipt
Production
Schedule By Line
Production Schedule By Line Part
Production Line Management
Production Line Management/Current
Production Schedule
Procedure
From the
Report Point Receipt/Production Receipt window:
- Open the
Report Point Receipt/Production Receipt
window.
- In the
Production Line list, select the production line and part for
which to report production.
- In the
Structure area, specify the structure
revision and structure alternate. If desired, you can specify the routing
revision and the routing alternate.
- Select the Receipt in Background check box to execute the receipt in the background.
- In the
Qty Reported field, type the quantity to report at the specific report
point. You cannot report more quantities than were reported at a previous
report point.
- Select the Edit Components check box.
-
Save.
The
Production Receipt
Material dialog box will appear.
- In the
Production Receipt Material
dialog box, type a value in the
Qty To Issue field.
- To change components, click
New. The cursor appears in the
Part To Issue field. Click
List
to select from available parts. Next, type a value in the Qty
to Issue field.
-
Save.
- To reserve the components before backflushing, select the components, then click
Assign.
The
Production Receipt Reservation dialog box will appear.
- In the
Production Receipt Reservation
dialog box, click
Create.
The
Inventory Part Location dialog box will appear.
- In the
Inventory Part Location
dialog box, select a location.
Click OK.
- In the
Production Receipt Reservation
dialog box, type a value in
the Qty Assigned field. Save, then click
OK when the reservations
are finished. Also enter the catch quantity that you want to reserve in the Catch Qty Assigned field.
- When you are finished editing and reserving components, click
OK to run
the backflush.
From the Production Schedule by Line or Production
Line Management/Current Production Schedule window:
- Search for the production line for which you want to report production.
- Select the production schedule line for which to report.
Right-click and then
click Production Receipt. The
Production Receipt
dialog box will
appear.
- In the
Production Receipt
dialog box, specify how many parts you
want to report and receive into inventory in the Qty Reported field. The scheduled
quantity is the default value.
- Select the Receipt in Background check box to execute the receipt in the background.
- In the Structure
area, specify the structure revision
and structure alternate. If desired, you can specify the routing revision and the routing
alternate.
- In the Location
area, select the
Report Point check box to create
a report point receipt.
- In the Location
area, specify the report point in the
Report Point field. Click List to select from available report points.
- To edit components, click
Components. The
Production Receipt
Material dialog box will appear.
- In the
Production Receipt Material
dialog box, type a value in the
Qty To Issue field.
- To change components, click
New. The cursor appears in the
Part To Issue field. Click
List
to select from available parts. Next, type a value in Qty to
Issue field.
-
Save.
- To reserve the components before backflushing, select the components, then click
Assign.
The
Production Receipt Reservation dialog box will appear.
- In the
Production Receipt Reservation
dialog box, click
Create.
The
Inventory Part Location dialog box will appear.
- In the
Inventory Part Location
dialog box, select a location.
Click OK.
- In the
Production Receipt Reservation
dialog box, type a value in
the Qty Assigned field. Save, then click
OK when the reservations
are finished. Also enter the catch quantity that you want to reserve in the Catch Qty Assigned field.
- When you are finished editing and reserving components, click
OK to run
the backflush.
From the
Production Schedule by Line Part
window:
- Search for the part for which to report production.
- Select the production schedule line for which to report production.
Right-click and then click Production Receipt. The
Production Receipt
dialog box will
appear.
- In the
Production Receipt
dialog box, specify how many parts you
want to report and receive into inventory in the Qty Reported field. The scheduled
quantity is the default value.
- Select the Receipt in Background check box to execute the receipt in the background.
- In the Structure
area, specify the structure revision
and structure alternate. If desired, you can specify the routing revision and the routing
alternate.
- In the
Location
area, select the
Report Point check box to create
a report point receipt.
- In the
Location
area, specify the report point in the
Report Point field.
Click List to select from available report points.
- To edit components, click
Components. The
Production Receipt
Material dialog box will appear.
- In the
Production Receipt Material
dialog box, type a value in the
Qty To Issue field.
- To change components, click
New. The cursor appears in the
Part To Issue
column. Click List to select from available parts. Next, type a value in
Qty to
Issue field.
-
Save.
- To reserve the components before backflushing, select the components, then click
Assign.
The
Production Receipt Reservation dialog box will appear.
- In the
Production Receipt Reservation
dialog box, type a value in
the Qty Assigned field. Also enter the catch quantity that you want
to reserve in the Catch Qty Assigned field.
-
Save.
- When you are finished with editing and reserving components, click
OK to
run the backflush.