Analyze Shop Order Material Availability using Visualizer Charts
Explanation
Use this activity to analyze the material availability of shop orders using
visualizer charts.
Prerequisites
A shop order with at least one material line must exist.
System Effects
The material availability of the visualized shop order(s) are displayed.
Window
N/A
Related Window Descriptions
N/A
Related Visualization Chart Descriptions
Inventory Part Availability Planning
Shop Orders Material Availability Summary
Shop Order Material Lines Availability
Shop Orders Material Availability
Shop Order Material Demand - Supplies Cover Demand
Shop Order Material Demand - Need Orders
Shop Order Material Demand - Shortage
Procedure
- Open a visualizer enabled window
and search for the data to be analyzed.
- If the Data View is displayed, click Visualization View on the title bar.
- Click the Configure Visualizations icon on the topmost right
hand corner. The Visualization Settings
dialog box is opened.
- Drag charts from Available Charts to Chart Layout from the charts listed under
Shop Orders Material Availability or
Part Availability.
- Use the Shop Orders Material Availability Summary to analyze the
worst case material availability per shop order.
- Use the Shop Orders Material Availability to analyze the worst
case material availability per shop order and order start date.
- Use the Shop Order Material Lines Availability to analyze the
availability per shop order material line and date required.
- Use the Shop Order Material Demand - Supply Covers Demand to
analyze the shop order material lines for which the demand is covered by
existing supply orders.
- Use the Shop Order Material Demand - Need Orders to analyze the
shop order material lines for which the demand is not fully covered by
existing supply orders, but can be made available given the lead time if a
new supply order is placed today.
- Use the Shop Order Material Demand - Shortage to analyze the shop
order material lines for which the demand is not fully covered by existing
supply orders, and cannot be made available on the required date given the
lead time even if a new supply order is placed today.
- Use the Inventory Part Availability Planning to analyze and
reschedule supplies and demands for a selected part.
- Click OK.