Phase Out or Replace Structure Component
Explanation
This activity is used to replace a component part in one
selected structure, several selected structures or in all the structures where
the component part is included. Depending on what you select in the window such
as the
rules for the site and the status on the structure, the outcome will be
different when a component part is replaced. In some of the scenarios, the
component part will be replaced in the existing structures and for other
situations a new revision will be created for the parent part.
Note: Depending on the site rule, structure status, time for the
phase out and selections in the dialog box, the replacement will either be in existing revisions or new revisions will be created. (Detailed information about the different situations
are described in the About documentation).
Prerequisites
This activity requires that the component must be defined in the
Inventory Part window.
System Effects
As a result of this activity, the system replaces a component in a selected
structure, several selected structures or in all the structures where the
component part is included, or creates a new inventory part revision for the structures.
Window
Phase Out or Replace Structure Component
Configuration Structure
Product Structure
Planning Structure
Recipe Structure
Related Window Descriptions
Phase Out or Replace Structure Component
Configuration Structure
Product Structure
Planning Structure
Recipe Structure
Procedure
To replace a component by using a right-click from a structure window
- Display the parent part by clicking Populate (F2) or by
making a selective query (F3).
- On the Structure tab, select the row whose
component you want to replace, right-click then click Phase out or
Replace Structure Component. The Phase Out or Replace
Structure Component dialog box opens.
- The part number for the component to be phased out or replaced is in the
Part No field. This replacement will follow rules depending
on the structure status, structure update level of the site, replacement date
and the choices in the dialog box.
- In the Phase Out field, enter the phase-out date to be
used when a structure is phased out to accommodate the changes defined in
this dialog box.
- In the Component In area, enter the part number of the
component to be phased in in the Part No field. If the
window is open from Product, Planning or Configuration Window there is a
field for Qty per Assembly field, enter the quantity of
the component to constitute one parent part.
- If you select the Copy Configuration check box, all the
rules of the old component will be copied to the new component, if not, no
rules will be copied. The log, which shows the parts that have rules copied
or not can be seen in the background job.
- If the Structures Exist with Parent Part Phase in Date earlier
than Component Part Phase In is selected, a new revision will be
created for the parent part.
- The Update All Effective Structures check box is not
available when the window is open from a structure window.
- If the Create New Revision
for Buildable
check box is selected, the site with structure update level simplified will
be handled as enhanced or simplified site. i.e. New revisions will be
created when the originating structure is in the Buildable
state.
- If you need to create the new revision in the same status as the
original structure revision, select the Create Revision in same
Status as Existing.
- Click OK.
To replace components by start the dialog from the navigator.
- Open the Phase out or Replace Structure Component
dialog box.
- Enter the part number for the component to be phased out or replaced in the Part No
field. This replacement will follow rules depending on the structure
status, structure update level of the site, replacement date and the choices
in the dialog box.
- In the Phase Out field, enter the phase-out date to be
used when a structure is phased out to accommodate the changes defined in
this dialog box.
- In the Component In area, enter the part number of the
component to be phased in in the Part No field.
- If you select the Copy Configuration check box, all the
rules of the old component will be copied to the new component, if not, no
rules will be copied. The log, which shows the parts that have rules copied
or not can be seen in the background job.
- If the Structures Exist with Parent Part Phase in Date earlier
than Component Part Phase In is selected, a new revision will be
created for the parent parts that are affected by the criteria.
- If the Update All Effective Structures check box is
selected, all the effective structures having the component will be
affected. If you need to select specific structures, you need to clear the
check box and the table will be populated with all the effective structure.
Note: A negative
value in the Qty per Assembly column indicates that the
part is a by-product in the structure.
- If the Create New Revision for Buildable check box is selected, the
site with structure update level simplified will be handled as enhanced or
simplified site. i.e. New revisions will be created when the originating
structure is in the Buildable state.
- If you need to create the new revision in the same status as the
original structure revision, select the Create Revision in same
Status as Existing.
- Click OK.