Create Severity

Explanation

This activity is used to create severities that will be connected to fault types in Failure Analysis Setup Navigator. For example, define severity 1 as the highest level of severity to be connected to a fault type.

Prerequisites

N/A

System Effects

As a result of this activity, a severity is created and can be used in the Failure Analysis Setup Navigator/Fault Types tab.

Window

Work Order and PM Basic Data

Related Window Descriptions

Work Order and PM Basic Data
Work Order and PM Basic Data/Severities

Procedure

  1. Open the Work Order and PM Basic Data window.
  2. Click the Severities tab.
  3. Create a new record.
  4. Enter a numerical value in the Severity Rank field.
  5. Enter a description in the Severity Description field.
  6. Enter a description in the Effect Description field.
  7. Save the record.