This activity is used to connect a linear asset to a work order.
Note: The Connection Type can be changed between EQUIPMENT and LINEAR ASSET if the work order status is below the status prepared.
A linear asset must exist and be connected to a site.
A linear asset will be connected to the work order.
Prepare
Work Order
Report In
Work Order
Prepare Work Order
Prepare Work Order/Linear
Asset
Report In Work Order
Report
In Work Order/Linear Asset