Add Sub Contract Line Item
Explanation
This activity is used to add sub contract line items. For all sub contract
lines, there can be zero or more line items. When a new line item is added, the
values in the following fields appear automatically:
- Planned Start
- Currency Type
- Item Currency
- Supplier Start Date
- Change Status Tender Base (if baseline is already set)
- Change Status Contract Base (if baseline is already set)
- Valuation Method
- Tax Code
- Supplier Income Type ID and Income Type Description if a
supplier, with a default supplier income type, is specified. Note: If a supplier income type is defined on a contract item, it is
an indication that this item will withhold tax.
The project ID and purchase part site values will not be copied to the new
sub contract line item. You can override some default values, if required, in
the respective override fields. Note that if a default value is modified on the
contract, while a line item has a value for the same in the override field, the
change you made will not affect the line item. The values in the override fields
will take precedence over the values in the general fields. Therefore the change
will only effect items that do not have an override value.
If the valued item is not a work item or an item to be consumed, it is
recommended to use a separate line item for the stored material value to prevent
mixing the value of the item and the stored material of the same item.
Note: Tax rates for a supplier may change during the life cycle
of a contract. If this occurs, the tax rates for existing contract items can
be updated, if the Refresh
Line Item Taxes check box is selected while activating the contract revision
or while awarding the contract or anytime by selecting Set Default in
Sub Contract Item Tax Lines dialog.
When an valuation is created for an item, the currency, unique project and billing sequence of the item are used to create a unique
valuation. Billing sequence is a numeric value that you can assign to items
that you wish to be grouped together, when you create the valuation. A billing
sequence can be added to an already existing line item only if it has not been
included in any valuation.
Prerequisites
- A sub contract line should exist.
- The sub contract should not be in the Cancelled,
Completed or
Closed status.
- The sub contract revision should not be in the Cancelled or Obsolete
status.
- The sub contract revision should not be frozen.
System Effects
- A line item is added to the
Lines/Items tab.
Window
Sub Contract
Related Window Descriptions
Sub Contract/Items
Sub
Contract/Items/Lines/Items
Procedure
- Open the
Sub Contract window and query (F3) for the
necessary sub contract.
- Click the
Items tab.
- In the Revision No list, select the revision to which a line item
is to be added. The default value is set to the active revision, or if there
is no active revision to the most recent revision.
- Click the
Lines/Items tab.
- In the upper table, select the line to which an item is to be added.
- Create a new record (F5) in the lower table.
- If necessary, enter an item number. (If this value is left blank, upon
saving, the system will automatically enter a number in the field by finding
the highest item number for the sub contract and incrementing it by 1.)
- In the Item Name field, enter the item name.
- Required values will vary according to the values you select in the
Calculation Method and Calculation Type
lists.
- If Activity Required check box is selected on
the Defaults tab, project information is required.
- Enter a number in the Billing Sequence field for the item if you
wish to categorize it separately at the time of creating a valuation.
- Enter information in any other fields in the tab, as required.
- Save the information (F12).