Calculate Warranty Dates

Explanation

This activity is used to calculate warranty dates for the supplier warranty that is connected to the serial. Once the start date of the warranty is specified, the system will calculate the warranty end date based on the given start date, minimum value, maximum value and time unit of the warranty condition.

Prerequisites

System Effects

As a result of this activity, valid warranty dates are registered on the serial.

Window

Serial Structure Information

Related Window Descriptions

Calculate Dates
Serial Structure Information/Additional Serial Info/Supplier Warranty
Serial Structure Information/General
Serial Structure Information

Procedure

  1. Open the Serial Structure Information window and query (F3) for the serial to which your supplier warranty is connected.
  2. Click the Additional Serial Info tab and then click the Supplier Warranty sub tab.
  3. Enter or modify the values in the Min Value and Max Value fields, if needed.
  4. Save your changes (F12).
  5. Select the row that contains the supplier warranty you want, right-click and then click Calculate Dates. The Calculate Dates dialog box opens.
  6. In the Valid From field, enter or modify the start date you want.
  7. Click OK to calculate the warranty dates.

Optional Procedure:

Use the following procedure when you want to remove previously calculated warranty dates (i.e., the dates that were calculated using the Calculate Dates option) from the warranty.

  1. Select the row that contains the supplier warranty you want, right-click and then click Calculate Dates. The Calculate Dates dialog box opens.
  2. Clear the date displayed in the Valid From field.
  3. Click OK.
  4. Observe that the dates in the Valid From and Valid To fields in the Supplier Warranty sub tab have now been cleared.