This window can be used to obtain an overview of all stop events or to update information on the required stop event(s).
Stop events can be used for several purposes, such as:
You can create a new work order from a stop event (that will be connected automatically to the stop event) or you can connect an existing work order.
A stop event can be connected to one or more stop events, where the connected stop event should be of the system stop event type No Production Loss, e.g., the connected stop event should not be included in any APQ calculations.
This window can be accessed by performing a search for valid Stop events or by selecting the right mouse button Edit Event in the OEE Event Overview/Stop Event tab window.