Use this tab to view the estimated or actual cost figures for the MRO interim order structure. You can calculate estimated costs for interim orders in the order structure, as long as the structure state is not Canceled. As repair interim orders are connected to the interim order structure, or as work scope changes occur, for example specifying a different maintenance level, the estimated costs will change.
Once the supply shop orders have been released and reporting on disassembly has occurred, you can also calculate actual costs. The cumulative costs for the interim order structure are calculated using a conventional cost rollup for both disassembly and assembly structures based on the cost bucket definition in IFS/Costing.
Both the estimated and actual costs are shown by manufacturing level and accumulated by part. The variances between estimated and actual for level and accumulated cost are also shown. The costs are broken out by cost bucket, with a sum total at the bottom of the window. The summation provides an overview of the costs and variances for the entire interim order structure.