Reserve Handling Unit to Shop Order Material Line
Explanation
Use this activity to reserve complete handling unit(s) to a shop order
material line.
Prerequisites
This activity requires that:
- The shop order is in at least Released status.
- A handling unit with a quantity of the part to
reserve attached exists in inventory.
- The handling unit does not already have any reserved quantity.
- The handling unit does not contain mixed part
numbers.
- The quantity available on the handling unit is higher than zero, but not
larger than the quantity remaining to reserve.
- If the shop order material line supply code is Inventory Order, only the standard inventory is available
for reservation.
- If the shop order material line supply code is Project Inventory, only the project inventory
of the project connected to the shop order is
available for reservation.
- The ownership and owner must be the same on the
material line as on the handling unit to reserve.
- The condition code must be the same on the
material line as the handling unit to reserve.
System Effects
As a result of this activity:
- All stock records attached to the selected
handling unit, or any of its sub-level handling units will be reserved to
the shop order material line.
- If the shop order is in status Released,
its status will be changed to Reserved.
- If the shop order material line is in status
Released, its status will be changed to Reserved.
- When reserving a material line with a connected supply pegging, the reservation will reduce the pegged quantity by the same
quantity that was reserved. However, if there is more than one supply pegged to the same demand you will be notified to
manually adjust the peggings before the reservation can be performed.
Window
Shop Order
Shop Order Materials
MRO Shop Order
Disposition
Shop Order
Related Window Descriptions
Manual Reservation Shop Order
Manual Reservation Shop Order/Handling Unit
Shop Order
Shop Order/Materials
Shop Order Materials
MRO Shop Order/Materials
MRO Shop Order
Disposition Shop Order/Materials
Procedure
- On the
Shop
Order/Materials tab or in the Shop
Order Materials window, select one or more material lines
for which you want to reserve material.
- Right-click and then click Manual Reservations. The
Manual Reservation Shop Order window appears.
- In the Handling Unit tab, select
the handling unit to reserve, right-click and then click Reserve
Handling Unit.
- Repeat steps 3 for all handling units you want to reserve.
- Repeat step 1-4 for all material lines you want to
reserve.