Reschedule Shop Order Material Line

Explanation

This activity is used to reschedule a shop order material line and optionally the shop order operation requiring the material. The activity can be performed using the Reschedule command from a shop order material demand in the Inventory Part Availability chart.

This activity can be performed from IFS Aurena client only.

Prerequisites

A company owned shop order material demand must exist.

System Effects

If Reschedule Shop Order Operations is on:

If the site is CBS server enabled, it is only possible to change the Required Date of the material. Rescheduling of operations (with or without compress operations) is not possible as scheduling individual operations will be handled by CBS server logic and date required is not an input for operation scheduling. For CBS, Material cumulative lead time, scheduling capacity setting in the inventory part, supplies and demand situations for the part will determine the material constraint when scheduling.

Pages

Visual Shop Orders Planning

Visual Shop Order Materials Planning

Visual Inventory Part Availability Planning