Reschedule Operations Automatically

Explanation

Use this activity to reschedule all operations for a site.

Prerequisites

This activity requires that scheduled operations exist. It also requires a site connected to a Scheduling Server.

System Effects

As a result of this activity the system reschedules any operations that fall within your specified criteria.

When a work center resource, labor class person or a tool instance is blocked for use, operations already scheduled in the specific resource get unassigned and are not rescheduled in the blocked resource if Allow Reassignment option is selected while scheduling. If the Allow Reassignment option is cleared, operations that are already reserved on blocked resources can be rescheduled in the same resource.

Window

Schedule Operations

Related Window Descriptions

Schedule Operations

Procedure

  1. In the Site field, choose the site for which to reschedule operations. Use List to select from available sites.
  2. In the Dispatch Rule list, choose a dispatch rule to specify how the scheduling logic should sort orders before scheduling begins. If you do not want to use a dispatch rule, use the default value None.
  3. Select the Set Scheduling Start Time (Hrs from now) check box, then specify the global start time for rescheduling the operations.
  4. To specify how you want the Scheduling Server to organize the orders, select one or more of the remaining check boxes:
  5. Click OK.