Connect Part to Production Line
Explanation
Use this function to connect a part used in production schedules with one or
more production lines. When assigning a part to a production line, you also specify the schedule horizon
for the part. This has a default value of 100%. This is a simple way of defining how to
distribute the demand for the part to production schedules, when a single part is
produced on more than one line. The percentage cannot be less than zero. When production
schedules are created by Master Scheduling or MRP, the demand quantities are divided by
percentage into the line schedules. If the sum of the schedule percentage for a part
exceeds 100%, you receive a warning, but the transaction will complete. A part's primary
line is the production line having the greatest schedule percentage.
Prerequisites
This activity has the following prerequisites:
- The part has been created.
- The production line has been created.
- The schedule horizon must have been created before you can make a connection between the production line and the
production schedule part.
System Effects
As a result of this activity:
- You connect a part with a production line.
- When
production schedules are created by Master Scheduling or MRP, the demand quantities are
divided by the percentage specified for the part into the different line schedules.
Window
Production Line
Related Window Descriptions
Production Line
Production Line/Part
Production Line/Schedule Attributes
Production Line By Part
Procedure
From Production Line:
- Query the production line for which you want to assign a part in the
Production
Line field.
- Click the
Part tab. Select the first row of the table
window and create a new record (F5).
- In the Part No column, enter the ID of the part, or use the List
of Values to select from available parts.
- Save the record (F12).
- Click the Schedule Attributes tab.
- Specify the schedule percentage for the part in the Schedule Percentage column. This
value cannot be less than zero.
- Select the schedule horizon to which the part is to be assigned in the Horizon ID
column. Use the List of Values to select from available schedule horizons.
- Specify whether schedule fraction is allowed by selecting Fraction Not
Allowed or Fraction Qty Allowed in the Schedule Fraction column. This is used to avoid decimal
quantities on line schedules as a result of rounding.
- Specify how the receipt should behave in the Receipt in Background
column. You can select check box if receipt needs to be executed as a
background job else it runs on-line.
- Repeat steps 2 to 9 for each part you want to assign to the production line.
- Save the record (F12).