Configuration Conformance Check

Explanation

This activity is used to verify that the assembled structure is in conformance with the defined configuration rules (in Fleet and Asset Management) and that all requirements given in the work scope have been fulfilled.

You must sign off or cancel all finished events prior to performing this activity. Refer Maintenance Event Sign Off or Cancel Maintenance Event to complete this. Once this is done, you can perform a configuration conformance check to ensure that the approved work scope is completed and that it includes all changes implemented as per the given configuration rules.

The checks carried out when performing a final configuration conformance check is similar to the checks carried out on a serial structure when it is set to the Operational condition. In addition to these checks, the status of the LLP (Life Limited Part) and performed modifications are checked according to the configuration rules in Fleet and Asset Management as well as the approved work scope.

Any deviations found are recorded in the final conformance log as warnings. These deviations/warnings must be approved by the relevant authority, i.e., the engineer, before the overhauled object can be made operational. Once all deviations/warnings have been approved (or if no deviations/warnings exist for the serial structure), the operational condition of the overhauled object is set to Operational. At this instance, the associated work order is automatically set to the Work Done status.

Following is a list of valid error categories used in the final configuration conformance check:

All generated warnings must have been completed either by directly correcting the error(s) in the serial structure or by approving the warning record. Note: Corrections on the overhauled object may result in additional structure changes. The final configuration conformance check can be performed several times. It can also be performed as a batch job.

Prerequisites

The following prerequisite is required when removing preliminary conformance log entries and creating the on-log structure:

System Effects

As a result of this activity:

Window

Define Work Scope

Related Window Descriptions

Define Work Scope 
Define Work Scope/Final Conformance Log

Procedure

  1. Open the Define Work Scope window and query (F3) for your work order.
  2. Click the Final Conformance Log tab.
  3. Right-click on the table of the window, and then click Run Final Conformance Check. The Conformance Check Run Options dialog box opens.
  4. If needed, select the Run in Background check box.
  5. Observe the warnings that are generated in the tab window.
  6. To approve a warning, select the relevant warning record, right-click, and then click Approve Warning.
  7. You need to manually perform corrections for the warning(s) that cannot be approved.

Optional Procedure:

  1. Select the Run Final Conformance Check option once again.
  2. If needed, you can remove an approval. Select the relevant approval record, right-click, and then click Remove Approval.