Complete Off Log Structure for New Serials
Explanation
This activity is used to populate missing parts/serials of the Off Log
structure for a selected branch of the Off Log structure. Serials which are
different to the ones that are expected may be added to the work scope during
the disassembly. This activity requires that the Off Log structure node does not
have structure information yet in the Off Log while the serial structure
information exists in Fleet and Asset Management. When the prerequisites have been fulfilled, this
activity will read the serial structure information and store that into the Off
Log. You are allowed to populate one or all levels from the serial structure.
If this unexpected or new serial's structure carries position parts
holding a quantity higher than one for serialized parts, then they will be added
to the
Map Serial Numbers tab in
Reconfigure Work Scope
window. It is also be possible to populate the Off Log for a certain work
order with selected structure branches for a given parent serial that already
exists in the Off Log. When executing this activity if all the serial
structure information have not yet been entered in Fleet and Asset Management, then serialized parts
with serial numbers and non-serialized parts will be inserted to the
Off Log.
Prerequisites
- A work scope must exist.
-
New serials in work scope do not yet have structure information in
the Off Log.
-
Structure information for new serials has been entered in
Fleet and Asset Management.
-
Assembly has not started.
System Effects
-
The Off Log is populated with structure information.
- Adding events for new serial and its structure can be added in
Reconfigure Work Scope window.
Window
Maintenance Event
Summary
Reconfigure
Work Scope
Related Window Descriptions
Maintenance Event Summary/Actual Off Log
Reconfigure Work Scope
Procedure
Option 1:
- In the Maintenance Event Summary window query (F3) the work order for
which you created the work scope.
- Click the Actual Off Log tab and select the new serial which
does not have structure information yet in the Off Log. Note that for such
serials both Added to Work Scope and Lacking Structure check
boxes are selected.
- Right-click and then click Complete Off Log Structure to copy
structure information to Off Log from Fleet and Asset Management. If you wish to copy one
level then select Copy only one level checkbox in the
Complete
Off Log Structure dialog box.
Option 2:
- Open the Reconfigure Work Scope window and query for the
new serial which does not have structure information yet in the Off Log.
- Right-click and the click Complete Off Log Structure from the
header to copy its structure information to the Off Log.
Note: The function Complete Off Log Structure doesn't copy
serials without serial numbers in a structure. In such cases you need to
complete the structure information in VIM and select the Complete Partial Off
Log option available from the tab
Serial Structure
Information/Consist
Of.
Option 4:
- Open Serial Structure Information window and query for the serial
which has been added to the work scope with lacking structure information.
- Click the Consist Of tab and select the serial which lacks
the serial information and complete all the necessary information.
- Next select the right mouse button option Complete Partial Off Log
on the selected serial to open the
Complete Partial Off Log dialog
box. In the Destination Work Scope field enter the work order number or
use the List button to select the the work order number for which you
created the work scope and press OK.
- Observe that the Off Log is updated with new serial's structure
information.
Note that the above steps can be followed on each included parent of a top
serial added to the work scope as a DPF or new serial.