Create IPC Document Revision for Assembly

Explanation

This activity is used to create an IPC Document change source, link it to an assembly and upload a new IPC document revision. The IPC change source serves as the base to which assemblies can be linked, in order to effect changes required to a specific assembly by a new IPC Document revision.

For IPC Documents, you create the IPC Change Source on the IPC Documents page. An assembly should be added to the IPC Document, on the Assemblies tab. You can then upload the new IPC Document Revision by clicking Upload New Revision and filling in the requested information. At this point, you can set if you want to generate the baseline to be sent to the engineering service partner, or you can generate it at a later time after the upload.

Prerequisites

System Effects

Procedure

  1. Open the IPC Document page. 
  2. Click New.
  3. Enter the IPC Code, IPC Name, Doc No, Model and Customer in the respective fields.
  4. Click Save.
  5. On the Assemblies tab, click New.
  6. In the Assembly field, enter or select the assembly to which the IPC Document applies.
  7. Click Save.
  8. In the header, click Upload New Revision.
  9. Select or drag and drop the IPC Revision file to the provided area.
  10. Enter the Change Source Code, Change Source Name, IPC Revision No and IPC Revision Date in the respective fields.
  11. Turn Generate Baseline on or off depending on if you want to generate the baseline at the same time as uploading the document.
  12. Click Upload.

To generate the baseline at any point after a revision has been uploaded:

  1. Open the IPC Document page.
  2. On the Revisions tab, select the revision for which you want to generate the baseline.
  3. Click Generate Baseline.