Handle Status on Design Object
Explanation
This activity is used to change the design status of a design object. The
following actions are used to change the design status:
- Set Planned for Operation
- Set Completed
- Set ReDesign
- Set Planned for Scrap
- Set Scrapped (for design status only). This command also exists for
operational status. Refer to Activity Set
In/Out of Operation for details on changing operational status.
Refer to About
Object Status for a complete description of status change (both design
status and operational status). Refer to About
Status Changes and IFS/Equipment for details on data transferred between the
two products.
Prerequisites
A design object must exist in IFS/Asset Design.
System Effects
Changing the design status may cause one or more of the following to occur:
- The design status is changed to another status.
- A parallel equipment object is created in IFS/Equipment and data is
transferred to it from the design object. If the equipment object
already exists in IFS/Equipment, only data is transferred.
- The design object's Functional Object Information command is
activated and enables navigation from the design object to the
equipment object within IFS/Equipment.
- Within the Business Object Explorer a small overlay may appears on the object's icon
indicating a change in design status. The object should be refreshed in the
navigator to view the change. To do this right-click on the design object
and click Refresh.
- The operational status (for both the design object and the equipment
object) may be affected.
- If the design object is connected to a linear asset (available if
IFS/Linear Asset is installed) a new revision of the linear asset will be
created.
Window
Design Object
Design Objects
Related Window Descriptions
Design Object
Design Objects
Procedure
- Open the Design Object window or the
Business Object
Explorer if you want to change the status for one object and open the
Design Objects windows if you want to change the status for many objects.
- Search for or locate the required design object or design objects. If more than
one design object is displayed, select the design objects.
- Right-click, click Status and then click the required status
change.
Use the following procedure to change the status of design objects in a
structure:
- Open the Design Object or
Design Objects window.
- Search for the required design object. Select the design object.
- Right-click and click Change Status on Structure. The
Change Status on Structure dialog box opens.
- In the Change Object Status to field, select the status to change to,
from the drop-down list.
- In the Select Structure to Change group of fields, select either
the Functional Structure or Locational Structure
check box, depending on the type of
object structure required to be changed.
- Select the Ignore Objects with Invalid Status
check box to apply the status change on those objects in the structure for
which the change is possible and to disregard those for which it is not.
- Select the check box for either Run as Background
Job or Refresh Client, depending on if you want to run
the status change as a background job, if time consuming, or to refresh the
form from which the status change is being performed so that the change will
be visible immediately after the operation is complete.
- Click OK.